Latest Energy Union Choices report: “Cleaner, Smarter, Cheaper”
For the purpose of the study, Artelys fed its European power market simulation tool Artelys Crystal Super Grid with the most up-to-date investment cost data for renewable technologies. The tool was further enriched by a set of flexible demand side management options. Artelys Crystal Super Grid jointly optimises investments in renewables and accompanying flexibility solutions and the hourly dispatch of all European power generation, transmission, flexibility and storage assets to meet 2030’s power and reserve needs.
Under the baseline scenario, considering the policy framework of the European Commissions “Clean Energy for All Europeans” Package (CEP), renewables reach about 55% of net power generation. The share rises up to 61% if Member States decommission part of their coal and nuclear capacities and simultaneously pave the way for a comprehensive deployment of demand side response measures. This accelerated transition towards the higher RES share is estimated to be cost-neutral (or even beneficial), while bringing CO2 emissions further down to 67% below 1990’s levels and creating some 65,000 additional jobs.
The study was publicly launched in Brussels on 21 November 2017 in the presence of Maroš Šefčovič (European Commission Vice President), Laurence Tubiana (CEO ECF) and Claude Turmes (MEP).
It will provide useful input into the ongoing debate about the adoption of the CEP and the prioritisation of infrastructure projects on the EU level, as well as on the feasibility and impacts of national phase-out strategies at Member State level.
The study was commissioned by the European Climate Foundation, conducted by Artelys and overseen by a consortium of organizations including E3G, Regulatory Assistance Project, BPIE and WWF.
Artelys: Our solutions for maximising the value of hydropower assets
Hydropower plays a strategic role in the energy transition thanks to its unique ability to provide flexibility, storage, and dispatchability to the electricity system. However, managing hydropower systems is becoming increasingly complex: hydrological uncertainty linked to climate change, market volatility, evolving grid needs, and aging assets all call for a rethink of decision-making methods.
Supporting Lithuania’s Energy Security: National Resource Adequacy & Flexibility Needs Assessment for Litgrid
— Artelys is proud to have delivered a National Resource Adequacy Assessment (NRAA) for Litgrid, following the ENTSO-E ERAA methodology, alongside a Flexibility Needs Assessment (FNA) based on the framework set out by ACER.
Artelys Knitro 16.0: Model Nonlinear Problems Natively, Solve Them Concurrently
Artelys is pleased to announce the release of Knitro 16.0, a major version introducing two flagship features — a native Nonlinear Modeler and a Concurrent Solver — alongside significant performance and robustness improvements for nonlinear, mixed-integer and linear optimization problems.
First Successful Auction for the New French Capacity Mechanism!
— The first auction of the new French Capacity Mechanism was successfully held on Monday, 6 July 2026. Artelys is proud to provide the market clearing algorithm used to select the accepted capacity offers.
subscribe to our newsletters
© ARTELYS • All rights reserved • Legal mentions

