Improving electrical transformer production planning with artificial intelligence solutions
The growing electrification of industry is increasing the need for high-voltage transformers. At the same time, specifications are evolving, creating complex production challenges. To embrace the changes, Hitachi Energy’s Varennes plant teamed up with Artelys and École Polytechnique de Montréal to better assess the impact of these changes on production and optimize its planning.
Challenges and Solutions
Hitachi Energy is facing challenges in accurately estimating production loads in each department of its plant, based on the design specifications of the finished product. As these estimates are crucial to planning, this variability complicates scheduling and has an impact on delivery times.
To overcome these challenges, Artelys and a student from École Polytechnique de Montréal have developed advanced artificial intelligence models which, based on design specifications, provide estimates of production time. These models currently focus on two key stages of production – the production of transformer cores and windings. By minimizing bias and variance in workload estimates, the proposed models reduce the average absolute error from 35% to 22%. This increased accuracy will improve planning and resource allocation, resulting in smoother operations and better delivery times.
Future Collaboration
Building on the successful implementation of these models, Artelys and Hitachi Energy are extending this methodology to the entire production chain. The next phase is to develop a comprehensive software solution to facilitate adoption by Hitachi Energy Varennes teams.
Eventually, the aim is also to improve planning by using stochastic optimization techniques to create more flexible and efficient production schedules.
The collaboration between Artelys, École Polytechnique and Hitachi Energy demonstrates the potential gains for the manufacturing industry in using advanced data processing and optimization techniques.
This collaboration was possible thanks to the the support of the IVADO research, training, and knowledge mobilization consortium in artificial intelligence.


Hitachi Energy Electrical Transformer Factory in Varennes, Quebec, Canada
For more information about Artelys‘s optimization services, visit our dedicated web page or contact us directly!

Swissgrid selects Artelys Crystal Super Grid
Artelys is pleased to announce that Swissgrid, the Swiss electricity Transmission System Operator (TSO), has selected Artelys Crystal Super Grid, our multi-energy simulation solution, to support their strategic planning and system analysis activities.

Artelys led the Assessment of Policy Options for Securing Inertia for the European Commission
The European Commission’s Directorate-General for Energy (DG ENER) selected Artelys (leader), Trinomics, and Tractebel ENGIE to study solutions for ensuring the future frequency stability of the European power system. The study report was published in August 2025 by...

Artelys Knitro 15.0: New Tools for Your Large-Scale Models
Artelys is pleased to announce the release of Knitro 15.0, which provides new algorithms and performance improvements to solve your large-scale optimisation problems, whether linear or non-linear, more quickly.

Artelys Introduces Future Sight: a Visualisation Tool Supporting the Energy Transition
As partner in the European Climate + Energy Modeling Forum (ECEMF) – a Horizon 2020 Europe project uniting research institutes and leading energy modellers in Europe – Artelys has contributed to modeling activities powered by Artelys Crystal Super Grid modelisation tool, and has led the development of a fully-fledged visualisation tool.
subscribe to our newsletters
© ARTELYS • All rights reserved • Legal mentions