High penetration of variable RES is possible in the Contracting Parties of the Energy Community without additional investments into flexibility sources but via increased market integration
In this study, future flexibility needs are evaluated and cost-optimal portfolios of flexibility solutions are determined at the 2030- and 2040-time horizon. A wide range of scenarios are considered, varying in terms of variable RES deployment, phase-out of coal-fired power generation and levels of cross-border interconnection capacity. The scenarios required an extensive data collection and were built in coordination with the Contracting Parties.
Modelling a cost-optimal flexibility portfolio
In order to determine the cost-optimal flexibility portfolios for each Contracting Party (CP), the European energy system model Artelys Crystal Super Grid was extended to Ukraine and Moldova. The modelling exercise was performed via a joint capacity and dispatch optimization of the flexibility portfolios for the different scenarios, with an hourly time resolution and a national granularity.
Eight CPs (Albania, Bosnia and Herzegovina, Kosovo, Moldova, Montenegro, North Macedonia, Serbia, Ukraine) were jointly modelled with the EU Member States, whereas Georgia was modelled independently as an electric island with partial interconnection with neighboring countries.
Two levels of cross-border exchange capacities were considered in this study, reflecting two market integration scenarios. One approach restricts the utilization of NTC capacities to the values observed in the past, whereas the other one makes available at least 70% of the nominal transmission capacities for trading purposes.
The optimal flexibility solutions in the Contracting Parties in 2030 and 2040
A major conclusion from the modelling is that there is no need for investments in additional flexibility capacities by 2030. The existing capacities that provide system flexibility can cope with the rising flexibility needs related to an increasing degree of RES deployment as envisioned by the Contracting Parties, even in a scenario where RES deployment is ambitious, reaching up to 30 GW.
Necessary investments in new flexible solutions are low even in 2040, despite the coal and lignite phase-out envisioned in almost all CPs. Interconnection capacities are the main provider of flexibility at the CP level, allowing to mutualise flexibility resources among CPs and with EU Member States.
Market integration of regional power systems decreases the need for investments in flexibility solutions and drives down CO2 emissions. Such regional cooperation facilitates RES integration at lower costs and reduces congestions between CPs and with neighbouring interconnected countries.
The vision of the Director of the Energy Community Secretariat
Based on the analysis, the Director of the Energy Community Secretariat, Artur Lorkowski, came to the conclusion: “The energy transition is irreversible and today’s study shows that nothing should stand in the way of more renewables. Against the background of the energy crisis, we must look for cost-effective solutions to unlock higher renewables potential. Further electricity market integration is the clear way forward.”
The report is available here!
Innovative grid technologies can improve renewable energy integration in the Latvian grid by up to 40%
—The power grid faces challenges in managing the increasing amounts of new wind and solar power generation. Grid Enhancing Technologies (GETs) are essential for optimizing the use of the existing infrastructure. Artelys carried out a study for Latvian Transmission System Operator (TSO) AST to assess the renewable generation hosting capacity of the transmission grid and to evaluate the benefits that GETs can provide to renewable integration. The study performed simulations using the open-source optimal flow tool, PowSyBI Metrix. Results show that Grid Enhancing Technologies can increase Renewable Energy Sources (RES) hosting capacity by up to 40% and were announced in the following press release.
Artelys Knitro 14.1: delivers very quick solutions on non-convex models
— We are pleased to announce that Artelys Knitro 14.0 is now available! This new version enables compagnies to solve complex non-linear optimization problems with unprecedented efficency and precision.
You missed the METIS 3 Dissemination event? The slides are now available!
— Artelys was thrilled to organize the METIS 3 Dissemination webinar on April 17, which was a great opportunity to present key studies and upgrades of METIS models and datasets conducted in the last four years, including exciting discussions with external panelists!
Artelys participates in the demonstration of large-scale underground hydrogen storage in Europe
— Artelys is involved in the five-year project FrHyGe funded by the European Commission via the Clean Hydrogen Partnership.