Optimal scheduling of car manufacturing post-production assembly operations
Toyota post-production activity planning
The scheduling of post-production activities is complex because:
The installation activities require specific resources, They require versatile operators’ skills, They are spread among different shifts, Vehicles have delivery deadlines.
Therefore, a careful scheduling of work orders is needed to ensure smooth and optimized operations.

A Toyota post-production assembly workshop.
Artelys operational computation module
In order to improve the scheduling process of the following day’s activities, Artelys has developed an operational computation module deployed as a micro-service that is directly integrated into the application developed in-house by TME for their planning processes.
The developed module schedules the activities of the following day while optimising several metrics using Artelys Kalis, a constraint-programming solver with an interface dedicated to scheduling problems. The process of creating the following day’s schedule has been improved by replacing a tedious manual Excel process and has been shortened from approximately 2.5 hours to less than 30 minutes, while building solutions of better quality.
The computing speed allows for intra-day re-scheduling whenever a contingency occurs, as Artelys’ solution allows to schedule up to thousands of tasks in less than a minute. The solution is in use 7 days a week and is progressively deployed in all TME workshops.
If you want to know more about Artelys optimization services, check out our dedicated web page or contact us!

Artelys Introduces Future Sight: a Visualisation Tool Supporting the Energy Transition
As partner in the European Climate + Energy Modeling Forum (ECEMF) – a Horizon 2020 Europe project uniting research institutes and leading energy modellers in Europe – Artelys has contributed to modeling activities powered by Artelys Crystal Super Grid modelisation tool, and has led the development of a fully-fledged visualisation tool.  

Supercharging Optimisation: How Artelys, FICO and NVIDIA cuOpt Join Efforts to Scale Up Energy System Optimisation
As energy system models continue to scale—reaching up to hundreds of millions of variables and constraints—traditional CPU-based optimisation solvers are hitting performance and memory bottlenecks. These increasingly complex models are essential for planning Europe’s energy transition, yet solving them within realistic timeframes has become a pressing challenge.

Artelys is powering SEleNe CC’s Common Grid Model (CGM) Service
Artelys provides maintenance and support services of the calculation module used to perform the European Merging Function (EMF) at SEleNe CC

Improving electrical transformer production planning with artificial intelligence solutions
Improving high-voltage transformer production planning at the Hitachi Energy factory in Varennes with advanced artificial intelligence solutions.
subscribe to our newsletters
© ARTELYS document.write(new Date().getFullYear()); • All rights reserved • Legal mentions