Asset costs (€)#

indexed by: asset, cost_type, node, technology and test case

Description#

The KPI computes the costs incurred by the operation of each asset of the realization. Asset costs are calculated as the sum of :

  • System costs of each asset such as computed by associated KPI (see System costs)

  • Costs associated to energy consumption

  • Costs associated to CO2 and CO2 captured production

Calculation#

For more details on computation method, please refer to the Asset costs view as long as this KPI is directly the aggregation of the temporal Asset costs view KPI.

Global variables and parameters notations definitions can be consulted here.